1、雙組份打膠機設備應裝置在枯燥、無(wú)粉塵、無(wú)腐蝕性氣體的壞境中,該要求與其他設備一致,當然如果條件達不到少爭取無(wú)腐蝕性氣體,究竟設備中有電線(xiàn)以及管路這些配件抗腐蝕性不高。
1. The equipment of two-component glue applicator shall be installed in a dry, dust-free and corrosive gas free environment. This requirement is consistent with other equipment. Of course, if the conditions are not met, at least strive for no corrosive gas. After all, the corrosion resistance of wires and pipelines in the equipment is not high.
2、室內溫度好控制在10~40度的室內堅固地上上,地上應水平度要好。
2. The indoor temperature shall be well controlled, and the indoor solid ground with a temperature of 10 ~ 40 degrees shall be better leveled on the ground.
3、雙組份打膠機裝置之前,應先檢查是否有因運輸、搬動(dòng)造成的變形、損壞和緊固件松動(dòng)狀況,之前就曾經(jīng)有客戶(hù)在移動(dòng)打膠機的過(guò)程中把設備的智能控制系統的一個(gè)零部件碰掉了而導致設備無(wú)法正常運轉,咱們的工作人員到現場(chǎng)后才排查出的原因。
3. Before installing the two-component glue applicator, we should first check whether there is deformation, damage and fastener looseness caused by transportation and moving. Before, a customer knocked off a part of the intelligent control system of the equipment in the process of moving the glue applicator, resulting in the failure of normal operation of the equipment. Our staff found out the reason after arriving at the site.
4、咱們可以依據地上平整度的實(shí)際狀況來(lái)經(jīng)過(guò)調整設備的可升降地腳螺栓來(lái)調整設備的水平度直到設備水平而穩固。然后按圖接線(xiàn)并牢靠接地,把氣源接入機器所配帶的氣源接口,保證無(wú)漏氣現象。
4. First of all, we can adjust the levelness of the equipment by adjusting the lifting anchor bolts of the equipment according to the actual situation of ground flatness until the equipment is horizontal and stable. Then connect the wiring according to the diagram and firmly grounded, and connect the air source to the air source interface equipped with the machine to ensure no air leakage.
5、雙組份打膠機向油槽中加注液壓油指定位置,46#液壓油。
5. The two-component glue applicator fills the oil tank with hydraulic oil to the specified position and 46# hydraulic oil.
6、接通電源并翻開(kāi)查看設備是否能夠正常運轉。
6. Turn on the power and turn it on to see if the equipment can operate normally.