野花社区www中文_野花社区最新_野花社区www高清在线观看_野花社区视频最新资源下载_野花影视大全在线观看免费高清6_野花社区www视频最新资源_野花影视大全在线观看_野花社区在线观看免费完整版www

你現在的位置:首頁(yè)>企業(yè)動(dòng)態(tài)

雙組份打膠機換桶的操作細節

瀏覽:0
使用過(guò)雙組份打膠機的朋友都知道,雙組份打膠機的膠是密封存放在膠桶中的,膠用完了需要更換新的桶裝膠才能繼續使用。今天濟南雙組份打膠機廠(chǎng)家給大家講解下更換膠桶的操作。
As all friends who have used the two-component sealant dispenser know, the sealant of the two-component sealant dispenser is sealed and stored in a plastic barrel. When the sealant is used up, you need to replace it with a new barrel of sealant before continuing to use it. Today, the manufacturer of the two-component sealant dispenser in Jinan explained the operation of replacing the glue bucket.
當膠桶中的膠水用完時(shí),設備的三色指示燈會(huì )亮紅燈且報警(膠水檢測報警),此時(shí)應該更換膠桶。具體步驟如下:
When the glue in the glue bucket is used up, the three color indicator light of the equipment will be red and give an alarm (glue detection alarm). At this time, the glue bucket should be replaced. The specific steps are as follows:
1、先在觸摸屏上點(diǎn)擊“膠泵停止”,及時(shí)關(guān)掉齒輪泵;
1. First click "glue pump stop" on the touch screen to turn off the gear pump in time;
2、關(guān)閉排氣閥,按住觸摸屏上的“上升”按鈕2秒,讓壓盤(pán)下邊粘的PUR熱熔膠及時(shí)脫落,不于在上升過(guò)程中從排氣閥溢出流在壓盤(pán)上面;
2. Close the exhaust valve, press and hold the "Up" button on the touch screen for 2 seconds, so that the PUR hot melt adhesive stuck under the pressure plate can fall off in time, so as not to overflow from the exhaust valve and flow onto the pressure plate during the rising process;
3、打開(kāi)排氣閥,繼續按“上升”按鈕,此時(shí)PUR熱熔膠機的加熱壓盤(pán)會(huì )緩緩上升,待一個(gè)密封圈脫離膠桶口后松開(kāi)“上升”按鈕,利用慣性讓壓盤(pán)慢慢脫桶,脫桶后可輕按“上升”按鈕將壓盤(pán)上升到上極限位置;
3. Open the exhaust valve and continue to press the "Up" button. At this time, the heating pressure plate of PUR hot-melt adhesive machine will rise slowly. After a sealing ring is separated from the opening of the glue bucket, release the "Up" button. Use inertia to let the pressure plate slowly release the bucket. After the bucket is removed, gently press the "Up" button to raise the pressure plate to the upper limit position;
濟南雙組份打膠機
4、將密封圈上的殘膠清理下,置換新的膠桶。
4. Clean the residual rubber on the sealing ring and replace it with a new rubber bucket.
當膠桶內的膠用完時(shí),應立即關(guān)閉A、B開(kāi)關(guān),停止打膠。打開(kāi)A(或B)膠泵充氣開(kāi)關(guān),選擇A(或B)膠泵提升機構為上升位置,點(diǎn)動(dòng)旋鈕使壓盤(pán)慢慢提起,此時(shí)應注意:膠桶盡量不要離開(kāi)底盤(pán),直壓盤(pán)完全脫離膠桶時(shí)關(guān)閉A(或B)膠泵的充氣開(kāi)關(guān)。
When the glue in the glue bucket is used up, immediately turn off switches A and B to stop the glue application. Turn on the inflation switch of A (or B) rubber pump, select the lifting mechanism of A (or B) rubber pump as the rising position, and jog the knob to lift the pressure plate slowly. At this time, it should be noted that the rubber barrel should not leave the chassis as far as possible until the pressure plate is completely separated from the rubber barrel, and turn off the inflation switch of A (or B) rubber pump.
具體操作:將B泵關(guān)閉,打開(kāi)B膠回流開(kāi)關(guān)然后打開(kāi)膠槍?zhuān)z條為白色即可。
Specific operation: Turn off pump B, turn on the return switch of glue B, and then turn on the glue gun until the glue strip is white.
以上就是雙組份打膠機換桶的操作細節,您對此有什么需求可以隨時(shí)來(lái)我們網(wǎng)站http://www.sdxfsljx.com進(jìn)行咨詢(xún)了解,有關(guān)人員將竭誠為您服務(wù)!
The above is the operation details of changing barrels of two-component sealant dispenser. If you have any needs, you can come to our website at any time http://www.sdxfsljx.com The relevant personnel will serve you wholeheartedly after consulting!

上一篇:雙組份打膠機機頭不在原位怎么調?
下一篇:打膠機設備平常使用中要進(jìn)行定期檢查

  • 微信