The two-component gluing machine is a special equipment for the production of hollow and curtain wall glass, which can complete the mixing and gluing of components a and B in the secondary sealing at one time. It is applicable to the glue with high matching accuracy and meets the production requirements of high-efficiency and high pass rate assembly line operation of glass deep processing enterprises. What is the installation sequence of the two-component gluing machine? Let's have a look.
1、雙組份打膠機設備應安裝在干燥、無(wú)粉塵、無(wú)腐蝕性氣體的壞境中(該要求與其他設備一致,當然如果條件達不到少爭取無(wú)腐蝕性氣體,畢竟設備中有電線(xiàn)以及管路這些配件抗腐蝕性不高)。
1. The two-component glue applicator equipment shall be installed in a dry, dust-free and corrosive gas free environment (this requirement is the same as that of other equipment. Of course, if the conditions are not met, at least strive for non corrosive gas. After all, the equipment has wires and pipes, and these accessories have low corrosion resistance).
2、室內溫度更好控制在10~40度的室內堅硬地面上,地面應水平度要好。(小編這里說(shuō)的地面水平度要好不一定要非常的平整才行,我們的設備在設計之初已經(jīng)考慮到了地面復雜性的因素所以對地面平整度是有相當大的忍讓度的,只要不是幅度提別的大一般都可以正常工作。)
2. The indoor temperature should be better controlled on the indoor hard ground of 10-40 degrees, and the ground should be level. (the ground levelness mentioned by the editor here does not have to be very flat. At the beginning of the design, our equipment has taken into account the complexity of the ground, so it has a great tolerance for the ground levelness. As long as the range is not increased, it can generally work normally.)
雙組份打膠機
3、雙組份打膠機安裝之前,應先檢查是否有因運輸、搬動(dòng)造成的變形、損壞和緊固件松動(dòng)情況,之前就曾經(jīng)有客戶(hù)在移動(dòng)打膠機的過(guò)程中把設備的智能控制系統的一個(gè)零部件碰掉了而導致設備無(wú)法正常運行,我們的工作人員到現場(chǎng)后才排查出的原因。
3. Before the installation of the two-component glue applicator, it is necessary to check whether there is deformation, damage and looseness of fasteners caused by transportation and moving. Previously, a customer knocked off a part of the intelligent control system of the equipment during the process of moving the glue applicator, which caused the equipment to fail to operate normally. Our staff found out the reason after arriving at the site.
4、我們可以根據地面平整度的實(shí)際情況來(lái)通過(guò)調整設備的可升降地腳螺栓來(lái)調整設備的水平度直到設備水平而穩固。然后按圖接線(xiàn)并可靠接地,把氣源接入機器所配帶的氣源接口,確保無(wú)漏氣現象。
4. First, we can adjust the levelness of the equipment by adjusting the lifting anchor bolts of the equipment according to the actual situation of the ground flatness until the equipment is horizontal and stable. Then connect the wires according to the drawing and reliably connect the air source to the air source interface provided by the machine to ensure no air leakage.
5、向油槽中加注液壓油指定位置,46#液壓油(約為50升左右)。
5. Fill the oil tank with hydraulic oil to the specified position, 46 # hydraulic oil (about 50L).
6、接通電源并打開(kāi)查看設備是否能夠正常運行。
6. Turn on the power and check whether the equipment can operate normally.
雙組份打膠機安裝的幾點(diǎn)正確順序就是以上六方面了,您對此有什么疑問(wèn)可隨時(shí)來(lái)我們網(wǎng)站http://www.sdxfsljx.com咨詢(xún)了解!
The correct installation sequence of the two-component gluing machine is the above six aspects. If you have any questions about this, please come to our website at any time http://www.sdxfsljx.com Consult and understand!

上一篇:雙組份打膠機操作時(shí)的詳細步驟
下一篇:打膠機工作完后中空膠固化慢的原因

  • 微信