野花社区www中文_野花社区最新_野花社区www高清在线观看_野花社区视频最新资源下载_野花影视大全在线观看免费高清6_野花社区www视频最新资源_野花影视大全在线观看_野花社区在线观看免费完整版www

你現在的位置:首頁(yè)>企業(yè)動(dòng)態(tài)

雙組份打膠機的安裝

瀏覽:0
1、雙組份打膠機設備應安裝在干燥、無(wú)粉塵、無(wú)腐蝕性氣體的壞境中(該要求與其他設備一致,當然如果條件達不到少爭取無(wú)腐蝕性氣體,畢竟設備中有電線(xiàn)以及管路這些配件抗腐蝕性不高)。
1. The two-component glue applicator equipment shall be installed in a dry, dust-free and corrosive gas free environment (this requirement is consistent with other equipment. Of course, if the conditions are not met, at least strive for no corrosive gas. After all, there are wires and pipelines in the equipment, and the corrosion resistance of these accessories is not high).
2、室內溫度控制在10~40度的室內堅硬地面上更好,地面應水平度要好。(小編這里說(shuō)的地面水平度要好不一定要非常的平整才行,我們的設備在設計之初已經(jīng)考慮到了地面復雜性的因素所以對地面平整度是有相當大的忍讓度的,只要不是幅度提別的大一般都可以正常工作。)
2. It is better to control the indoor temperature on the indoor hard ground of 10 ~ 40 degrees, and the ground should be better horizontal. (the ground levelness mentioned here must be very flat. At the beginning of the design, our equipment has taken into account the complexity of the ground, so we have a considerable tolerance for the ground levelness. As long as the range is not increased, it can generally work normally.)
3、雙組份打膠機安裝之前,應先檢查是否有因運輸、搬動(dòng)造成的變形、損壞和緊固件松動(dòng)情況,之前就曾經(jīng)有客戶(hù)在移動(dòng)打膠機的過(guò)程中把設備的智能控制系統的一個(gè)零部件碰掉了而導致設備無(wú)法正常運行,我們的工作人員到現場(chǎng)后才排查出的原因。
3. Before installing the two-component glue applicator, we should first check whether there is deformation, damage and fastener looseness caused by transportation and moving. Previously, a customer knocked off a part of the intelligent control system of the equipment in the process of moving the glue applicator, which led to the failure of the equipment to operate normally. Our staff found out the reason after arriving at the site.
4、我們可以根據地面平整度的實(shí)際情況來(lái)通過(guò)調整設備的可升降地腳螺栓來(lái)調整設備的水平度直到設備水平而穩固。然后按圖接線(xiàn)并可靠接地,把氣源接入機器所配帶的氣源接口,確保無(wú)漏氣現象。
4. Firstly, we can adjust the levelness of the equipment by adjusting the lifting anchor bolts of the equipment according to the actual situation of the ground flatness until the equipment is horizontal and stable. Then connect the wiring according to the diagram and reliably ground, and connect the air source to the air source interface equipped with the machine to ensure no air leakage.
5、向油槽中加注液壓油指定位置,46#液壓油(約為50升左右)。
5. Fill the oil tank with hydraulic oil to the specified position, 46# hydraulic oil (about 50 liters).
6、接通電源并打開(kāi)查看設備是否能夠正常運行。
6. Turn on the power and turn it on to see if the device can operate normally.
以上就是為大家介紹的有關(guān)雙組份打膠機的詳細介紹,希望對您有所幫助.如果您有什么疑問(wèn)的話(huà),歡迎聯(lián)系我們.我們將以的態(tài)度,為您提供服務(wù)http://www.sdxfsljx.com
The above is a detailed introduction to the two-component gluing machine. I hope it will be helpful to you If you have any questions, please contact us We will provide you with professional service http://www.sdxfsljx.com

上一篇:點(diǎn)膠機與灌膠機的區別有哪些?
下一篇:點(diǎn)膠機的應用

  • 微信