野花社区www中文_野花社区最新_野花社区www高清在线观看_野花社区视频最新资源下载_野花影视大全在线观看免费高清6_野花社区www视频最新资源_野花影视大全在线观看_野花社区在线观看免费完整版www

你現在的位置:首頁(yè)>企業(yè)動(dòng)態(tài)

什么是雙組分打膠機

瀏覽:0
什么是雙組份打膠機
What is a two-component gluer
1、接通氣源:
1. Connect the air supply:
電源接通,調節減壓閥0.4~0.6Mpa,檢查系統有無(wú)漏氣現象。然后試運行以下動(dòng)作:(1)A泵提升;(2)A泵充氣;(3)B泵提升;(4)B泵充氣。注意:提升氣缸提升時(shí),如果兩氣缸不同步,請下降原點(diǎn)后重新操作。
Turn on the power supply, adjust the pressure reducing valve to 0.4 ~ 0.6MPa, and check the system for air leakage. Then test run the following actions: (1) pump a lifting; (2) A pump inflation; (3) B pump lifting; (4) B pump inflation. Note: when lifting the lifting cylinder, if the two cylinders are not synchronized, please lower to the original point and operate again.
2、將雙組份打膠機的A、B組份膠桶就位,并與A、B膠泵的軸線(xiàn)對中。
2. Put the component A and component B rubber barrels of the two-component glue applicator in place and align them with the axes of the A and B rubber pumps.
以A組份為例:
Take component A as an example:
1)操作雙組份打膠機的手動(dòng)轉閥,將A泵提升高點(diǎn),提升過(guò)程中觀(guān)察各管路有無(wú)拉伸過(guò)緊處。
1) Operate the manual rotary valve of the two-component glue applicator, lift pump a to the high point, and observe whether each pipeline is stretched too tightly during the lifting process.
2)將膠桶放置在A(yíng)泵壓膠盤(pán)下,開(kāi)啟膠桶,將其中塑料袋外翻桶外,膠面塑料片取出。
2) Place the rubber bucket under the pressure plate of pump a, open the rubber bucket, turn the plastic bag out of the bucket, and take out the plastic sheet on the rubber surface.
3)使A泵壓盤(pán)緩慢下降,壓盤(pán)入桶時(shí)應使其與桶口對準,將壓膠盤(pán)排氣口打開(kāi),直到壓盤(pán)接觸膠面。待壓盤(pán)內氣體全部排放完并有少量膠從排氣口溢出時(shí),即可關(guān)閉排氣閥。(提升開(kāi)關(guān)保持下壓狀態(tài))
3) Slowly lower the pressure plate of pump a, align the pressure plate with the barrel opening when entering the barrel, and open the exhaust port of the pressure plate until the pressure plate contacts the rubber surface. When all the gas in the pressure plate is discharged and a small amount of glue overflows from the exhaust port, close the exhaust valve. (lift switch remains depressed)
4)開(kāi)機試打膠:將雙組份打膠機的主泵氣源開(kāi)關(guān)打開(kāi),按下膠槍開(kāi)關(guān),直A泵里空氣排凈槍口處出膠連續時(shí)停止。
4) Start up and try gluing: turn on the air source switch of the main pump of the two-component gluing machine, press the glue gun switch until the air in pump a is exhausted and the glue is continuously discharged from the muzzle.
用同樣的方法操作B泵。
Operate pump B in the same way.
4、打膠操作:
4. Gluing operation:
1)松開(kāi)比例杠桿上的比例泵鎖緊螺釘,將比例泵內外調整所需比例。只有當A膠和B膠的配比達到正常值時(shí),才可進(jìn)行下面的操作。
1) Loosen the locking screw of the proportional pump on the proportional lever and adjust the inside and outside of the proportional pump to the required proportion. The following operations can be carried out only when the ratio of glue a and glue B reaches the normal value.
2)置選擇旋鈕于A(yíng)、B泵開(kāi),將膠槍出口對準兩片玻璃的中縫,打開(kāi)膠槍開(kāi)關(guān),以適當速度平穩地移動(dòng)膠槍使玻璃槽內的雙組份膠填滿(mǎn)充實(shí)為佳。打膠結束時(shí)關(guān)閉膠槍。
2) Set the selection knob on pump a and pump B, align the glue gun outlet with the middle seam of the two pieces of glass, turn on the glue gun switch, and move the glue gun smoothly at an appropriate speed to fill the two-component glue in the glass tank. Close the glue gun at the end of gluing.
5、更換膠桶:
5. Replace the rubber barrel:
1)當雙組份打膠機的膠桶內的膠用完時(shí),應立即關(guān)閉A、B開(kāi)關(guān),停止打膠。
1) When the glue in the glue barrel of the two-component glue applicator is used up, immediately turn off the switches a and B to stop gluing.
2)打開(kāi)A(或B)膠泵充氣開(kāi)關(guān),選擇A(或B)膠泵提升機構為上升位置,點(diǎn)動(dòng)旋鈕使壓盤(pán)慢慢提起,此時(shí)應注意:膠桶盡量不要離開(kāi)底盤(pán),直壓盤(pán)完全脫離膠桶時(shí)關(guān)閉A(或B)膠泵的充氣開(kāi)關(guān)。
2) Turn on the inflation switch of a (or b) rubber pump, select the lifting mechanism of a (or b) rubber pump as the rising position, and jog the knob to lift the pressure plate slowly. At this time, it should be noted that the rubber barrel should not leave the chassis as far as possible until the pressure plate is completely separated from the rubber barrel. Turn off the inflation switch of a (or b) rubber pump.
3)撤出空桶,將新膠桶置于工作位置,重復第3、4、項操作。
3) Withdraw the empty barrel, place the new rubber barrel in the working position, and repeat operations 3, 4 and 4.
1、膠槍?zhuān)阂螂p組份打膠機是由兩種膠混合而成的,其凝固速度與環(huán)境溫度和A、B膠的比例有關(guān),混合后的膠一般在20分鐘之內就會(huì )反應固化。所以,當設備在正常打膠后,20分鐘之內不使用就需要將混合后的膠沖洗出來(lái),以免堵塞混膠器和膠槍。
1. Glue gun: because the two-component glue applicator is composed of two kinds of glue, its solidification speed is related to the ambient temperature and the ratio of a and B glue. The mixed glue will generally react and solidify within 20 minutes. Therefore, when the equipment is not used within 20 minutes after normal gluing, the mixed glue needs to be washed out to avoid blocking the glue mixer and glue gun.
具體操作:將B泵關(guān)閉,打開(kāi)B膠回流開(kāi)關(guān)然后打開(kāi)膠槍?zhuān)z條為白色即可。
Specific operation: turn off the B pump, turn on the B glue return switch, and then turn on the glue gun until the glue strip is white.
山東唐通機械設備有限公司是一家從事研制丁基膠涂布機,中空玻璃充氣機,雙組份打膠機以及斷橋鋁門(mén)窗、丁基膠打膠機設備等產(chǎn)品的高科技型企業(yè),產(chǎn)品穩定性好,效率高,維護方便,玻璃清洗機廠(chǎng)家真誠期待你的來(lái)電與咨詢(xún)
Shandong Tangtong mechanical equipment Co., Ltd. is a high-tech enterprise engaged in the development of butyl adhesive coater, hollow glass inflator, two-component gluing machine, broken bridge aluminum doors and windows, butyl adhesive gluing machine equipment and other products. The products have good stability, high efficiency and convenient maintenance. The glass washer manufacturer sincerely looks forward to your call and consultation
本文由濟南雙組份打膠機為您提供,我們的網(wǎng)站是:http://www.sdxfsljx.com我們將以全心全意的熱為您提供服務(wù),歡迎您的訪(fǎng)
This article is provided by Jinan two-component glue applicator. Our website is: http://www.sdxfsljx.com We will serve you wholeheartedly and welcome your visit

上一篇:雙組份密封膠的固化時(shí)需要注意那些事項?
下一篇:雙組份打膠機設計做好這三點(diǎn)很重要

  • 微信