1、雙組份打膠機設備應安裝在干燥、無(wú)粉塵、無(wú)腐蝕性氣體的壞境中(該要求與其他設備一致,當然如果條件達不到少爭取無(wú)腐蝕性氣體,畢竟設備中有電線(xiàn)以及管路這些配件抗腐蝕性不高)。
1. The equipment of two-component gluing machine should be installed in a dry, dust-free and non corrosive environment (the requirement is consistent with other equipment. Of course, if the conditions are not met, at least strive for non corrosive gas. After all, there are wires and pipelines in the equipment, and the corrosion resistance of these accessories is not high).
2、室內溫度更好控制在10~40度的室內堅硬地面上,地面應水平度要好。(小編這里說(shuō)的地面水平度要好不一定要非常的平整才行,我們的設備在設計之初已經(jīng)考慮到了地面復雜性的因素所以對地面平整度是有相當大的忍讓度的,只要不是幅度提別的大一般都可以正常工作。)
2. The indoor temperature should be controlled on the indoor hard ground of 10-40 degrees, and the ground should be level. (Xiaobian here says that the level of the ground must be very flat. At the beginning of the design, our equipment has considered the factors of the complexity of the ground, so it has a great tolerance to the level of the ground. As long as the range is not raised, it can work normally.)
3、雙組份打膠機安裝之前,應先檢查是否有因運輸、搬動(dòng)造成的變形、損壞和緊固件松動(dòng)情況,之前就曾經(jīng)有客戶(hù)在移動(dòng)打膠機的過(guò)程中把設備的智能控制系統的一個(gè)零部件碰掉了而導致設備無(wú)法正常運行,我們的工作人員到現場(chǎng)后才排查出的原因。
3. Before the installation of the two-component dispenser, we should first check whether there is deformation, damage and fastener loosening caused by transportation and moving. Before that, a customer knocked off a part of the intelligent control system of the equipment in the process of moving the dispenser, which led to the normal operation of the equipment. Our staff found out the cause after arriving at the site.
4、我們可以根據地面平整度的實(shí)際情況來(lái)通過(guò)調整設備的可升降地腳螺栓來(lái)調整設備的水平度直到設備水平而穩固。然后按圖接線(xiàn)并可靠接地,把氣源接入機器所配帶的氣源接口,確保無(wú)漏氣現象。
4. First of all, we can adjust the levelness of the equipment by adjusting the lifting anchor bolts of the equipment according to the actual situation of the ground flatness until the equipment is level and stable. Then according to the diagram wiring and reliable grounding, connect the air source to the air source interface of the machine to ensure no air leakage.
5、向油槽中加注液壓油指定位置,46#液壓油(約為50升左右)。
5. Fill the oil tank with hydraulic oil to the designated position, 46 ? hydraulic oil (about 50 liters).
6、接通電源并打開(kāi)查看設備是否能夠正常運行。
6. Turn on the power and turn it on to see if the device is working properly.